Improved Racing · Part # EC6-690

Improved Racing 2005-2013 C6 Corvette Lay-Down Oil Cooler Conversion Kit

$399.00

Fits: See the description and specifications for the applications Improved Racing lists; email us your vehicle and engine to confirm fitment before ordering.

Email a question about this partor write to rrmotorservices@gmail.com

Ships from Improved Racing in Orlando, Florida. We order it from Improved Racing when you place your order and email you the tracking when it ships. Your card is only charged after the supplier confirms the part. Stock shown is Improved Racing's (checked November 9, 2026); we confirm it with Improved Racing before charging your card.

Description

  • Convert the Improved Racing C6 oil cooler kit from the vertical mount setup to the new lay-down (horizontal mount) setup.
  • Recommended if your oil lines are more than 6 years old.
  • Gives the radiator unobstructed airflow to help keep coolant temps in check.
  • Custom mounting brackets and all hardware included.
  • Professionally assembled, pressure-tested -10AN oil lines with heat sleeve.
  • Perforated stainless steel rock guard shields the cooler from road and track debris.
  • Made in the USA.
Improved Racing Lifetime Warranty
White C6 Corvette cornering on track, rear three-quarter view.

Already running an Improved Racing C6 oil cooler kit? This kit converts it from the vertical mount to the lay-down position.

In the horizontal position, the oil cooler sits out of the radiator's air path, so the radiator gets unobstructed airflow.

Why Lay It Flat

A large oil cooler mounted vertically in front of the radiator does its job. It may also send the heat it just pulled from your oil straight into the radiator core behind it.

In some conditions, that shows up as coolant temperatures climbing under sustained load due to insufficient airflow to the radiator. The oil is fine. The coolant pays the price.

Improved Racing lay-down oil cooler visible through the front grille vanes of a yellow C6 Corvette, core mounted flat.

This kit repositions your MHX-248C oil cooler from the vertical mount setup to the lay-down (horizontal) setup, out of the radiator's air path, to keep coolant temps in check. It also frees up the space in front of the radiator. On a Z06, that space already holds the factory cooler, and on a supercharged or turbocharged build, that's where an intercooler heat exchanger goes.

Motorsport-Grade Components

The kit features professionally assembled and pressure-tested -10AN oil lines with a Viton rubber interior and stainless steel reinforcement. The lines are wrapped in a fire-proof silicone-fiberglass heat sleeve to prevent damage from exhaust heat.

Formed 5052 aluminum brackets, designed specifically for the MHX-248C, hold the cooler in the lay-down position.

Rock Guard Protection

Improved Racing C6 lay-down oil cooler kit rock guard installed.

Because the lay-down position sits low and exposed, a perforated stainless steel grate protects the cooler from road and track debris with minimal airflow restriction. The rock guard assembly is sized to the cooler's footprint for full coverage.

Applications

2005-2013 Chevrolet Corvette (C6), excluding ZR1.

Included in the Kit

  • Driver and passenger mounting brackets.
  • Professionally assembled & pressure tested, heat-shielded -10AN oil lines.
  • -10AN flare extension fittings.
  • Rock guard assembly.
  • Mounting hardware.
  • Cut template.

Installation Note

Installation requires removing the front bumper cover and permanently modifying it. The bumper cover, the plastic air guide behind it, and the radiator shroud are cut and drilled using our included cut template.

Professional installation is recommended.

Product description from Improved Racing.

Photos, product descriptions, specifications and instruction manuals from Improved Racing (improvedracing.com). Sold by RR Motor Services LLC, an Improved Racing dealer.

Instruction manuals

EC6-690-A_Rev-260925.pdf

Instruction Manuals from Improved Racing (18 pages), shown as published.

EC6-690-A_Rev-260925.pdf: pages (18)
EC6-690-A_Rev-260925.pdf, page 1 of 18
Page 1 of 18
EC6-690-A_Rev-260925.pdf, page 2 of 18
Page 2 of 18
EC6-690-A_Rev-260925.pdf, page 3 of 18
Page 3 of 18
EC6-690-A_Rev-260925.pdf, page 4 of 18
Page 4 of 18
EC6-690-A_Rev-260925.pdf, page 5 of 18
Page 5 of 18
EC6-690-A_Rev-260925.pdf, page 6 of 18
Page 6 of 18
EC6-690-A_Rev-260925.pdf, page 7 of 18
Page 7 of 18
EC6-690-A_Rev-260925.pdf, page 8 of 18
Page 8 of 18
EC6-690-A_Rev-260925.pdf, page 9 of 18
Page 9 of 18
EC6-690-A_Rev-260925.pdf, page 10 of 18
Page 10 of 18
EC6-690-A_Rev-260925.pdf, page 11 of 18
Page 11 of 18
EC6-690-A_Rev-260925.pdf, page 12 of 18
Page 12 of 18
EC6-690-A_Rev-260925.pdf, page 13 of 18
Page 13 of 18
EC6-690-A_Rev-260925.pdf, page 14 of 18
Page 14 of 18
EC6-690-A_Rev-260925.pdf, page 15 of 18
Page 15 of 18
EC6-690-A_Rev-260925.pdf, page 16 of 18
Page 16 of 18
EC6-690-A_Rev-260925.pdf, page 17 of 18
Page 17 of 18
EC6-690-A_Rev-260925.pdf, page 18 of 18
Page 18 of 18
Text of this document

C6 CORVETTE MHX LAY-DOWN COOLER CONVERSION KIT PART NO. EC6-690 MADE IN USA Important: Read these instructions in their entirety prior to installation. For contact information, visit www.improvedracing.com Copyright © 2008-2026 Improved Racing Products, LLC. All rights reserved. Rev 260925 APPLICATIONS • 2005-2013 (C6) Chevrolet Corvette (except ZR1). • Requires an installed EC6-600 Oil Cooler Kit. KIT COMPONENT LIST • Confirm all parts below are included before beginning installation. PART # QTY DESCRIPTION EC6-690-01 1 Driver side mounting bracket EC6-690-02 1 Passenger side mounting bracket EC6-690-62 1 Rock guard EC6-690-50 1 Oil line, IN to adapter, OUT from cooler EC6-690-51 1 Oil line, OUT from adapter, IN to cooler FML-10-10 2 -10AN flare extension, female to male, long HSC-1108 5 M6 x 30 mm stud, E5 external Torx HNT-1024 5 M6 spin nut, 10 mm hex HNT-3001 5 M6 clip nut HSC-1109 3 M6 x 20 mm socket head screw HSC-1110 4 M8 x 20 mm socket head screw HT-50 1 Silicone foam tape, 2 m roll HTD-1003 3 Cable tie HTD-1006 1 Push-in cable tie EC6-69X 1 Cut template TOOLS REQUIRED 7 mm, 10 mm and 12 mm sockets Drill with stepper drill bit or hole saw T15 Torx driver Center punch E5 external Torx socket Rotary cutting tool or reciprocating saw 4 mm and 5 mm hex keys Tape measure -10AN fitting wrench, aluminum (1 in.) Paint pen or permanent marker Torque wrench, 50 lb-in and 15 lb-ft Wire cutters or flush cutters range Push pin removal tool 2 Visit www.improvedracing.com for additional support INSTALLATION INSTRUCTIONS BEFORE YOU BEGIN WARNING: These products should only be installed by a qualified- mechanic. Improper installation could result in severe engine damage. WARNING: NEVER work under a vehicle supported only by a jack. WARNING: NEVER cap / plug the oil ports on the adapter. WARNING: Capped / plugged oil ports block oil flow in the engine and may result in catastrophic engine damage. Use a union to loop the lines, or create a new line to join the ports if servicing or removing the oil cooler from the vehicle. WARNING: Only qualified mechanics should install this oil cooler kit. WARNING: Improper installation may result in severe engine damage. WARNING: Confirm the car is not hot prior to installation. Use aluminum tools to avoid damaging fittings. Lubricate all fitting flares before final tightening of connection. Wrap tapered pipe (NPT) threads with Teflon (PTFE) tape or apply thread sealant to seal the threads. Lubricate O-rings prior to installation to prevent damage and ensure a leak-free seal. Read through this manual, in addition to the product manuals included with each part prior to installation. Visit www.improvedracing.com for additional support 3 MARK THE BUMPER COVER FOR CUTTING 1. Raise and support the vehicle using an automotive-approved car lift, frame stands or ramps. 2. Remove any underbody panels necessary to access the oil filter area. 3. If present, remove the rubberized felt covering the lower opening on the bumper cover by removing all six screws, shown in Figure 1. Figure 1 - Rubberized Felt, Item #19 4 Visit www.improvedracing.com for additional support 4. Mark the bumper for cutting later in the installation process, referring to Figure 2 and Figure 3. Apply masking tape over the cut lines to help prevent paint chipping. 7” Figure 2 - Front Trim Measurement Figure 3 - Side Trim Measurement, Both Sides Visit www.improvedracing.com for additional support 5 REMOVE THE BUMPER COVER 1. Open the hood of the vehicle. Apply masking tape on the fenders to prevent scratching when remov- ing the bumper cover. 2. Remove the front bumper cover by removing the fasteners listed below, and indicated in Figure 4: a. Four 7 mm bumper cover screws under the nose of the hood (blue). b. Ten 7 mm or T15 screws and/or push clips securing the fender liners, five per side (green). c. Five 7 mm screws securing the lower front edge of the bumper cover (red). d. Four 10 mm nuts securing the inside of the fenders, two per side (magenta). e. Two 10 mm nuts securing the rear of the lower bumper cover (orange). Removing the front wheels makes this step easier. Figure 4 - Front Bumper Fastener Locations 3. Disconnect all indicator and fog light wiring harness connectors. 6 Visit www.improvedracing.com for additional support 4. Remove four push pins (two per side) securing the radiator shroud to the core support, shown in Figure 5. Figure 5 - Radiator Shroud Push Pins 5. Carefully remove the front bumper cover. The top edges of the bumper cover near the headlights are clipped-in and must be released prior to removal. Visit www.improvedracing.com for additional support 7 REMOVE THE OIL COOLER & LINES 1. Place a drain pan under the oil cooler. 2. Cut and remove the push-in zip tie securing the oil lines to the radiator shroud. 3. Disconnect both oil lines from the oil cooler and allow the oil to drain. 4. Use a 12 mm tool to remove the four M8 screws securing the oil cooler to the radiator shroud. 5. Remove the oil cooler from the vehicle. 6. Place a drain pan under the oil filter and remove the oil filter. 7. Use a 5 mm hex tool to remove the oil cooler adapter located above the oil filter. Remove the rear screw first so that the front screw clears the catalytic converter during removal. 8. Remove the oil cooler adapter and oil lines out towards the rear of the vehicle. 9. Disconnect both oil lines from the oil cooler adapter. Leave the adapter fittings and NPT plug installed. Note the path of the oil lines before removal. The new lines follow the same path. INSTALL THE NEW OIL LINES 1. Connect the EC6-690-50 and EC6-690-51 oil lines to the oil cooler adapter fittings according to the part numbers shown in Figure 6. 2. Position the 90º hose end fittings as shown in Figure 6. EC6-600-51 OR EC6-690-50 EC6-600-52 OR EC6-690-51 Figure 6 - Hose-End Alignment on EGM-112 8 Visit www.improvedracing.com for additional support 1. Tighten the nut by hand -16 3⁄4 to 1 until it bottoms the seats. -20 1⁄2 to 3⁄4 -24 1⁄2 to 3⁄4 2. Using 3. Tightenathe marker, draw hose ends a adapter fittings according to the steps to the line lengthwise below: on the nut and extend a. Hand it fittings. tighten the onto the adapter. 3. b. Mark Using a the flats as shown wrench, Figure rotateinthe nut7.to tighten. TurnTighten c. the nut 1.25the amount to 1.75 hex flatshown on the chart. rotations. Mark a line on the nut Misalignment of the mark and adapter before torquing. shows the amount which the nut was tightened. Figure 7 - Marking the Fittings for Correct Tightening Alternate Tightening Method Two TheLeave 4. second alternate the tags method on the lines, of tightening then route is very each line between the engine simple mount,and easy to sub-frame remember. and engine block. Bring the nut to hand tight andthe Follow then rotateasathe same path quarter previousof oilalines. turn. This applies to 5. Use a 5 mm hex tool and the ocket screws in all sizes. Mark the fitting as indicated the flathe to reinstall method oil cooler to adapter confirmandthe quarter gasket turn. onto the oil pan. Shorten a 5 mm hex key to clear the factory catalytic converter and ease installation. 6. Torque the screws to 100 lb-in (11 N-m). Compliments of Aeroquip Performance Product team. For for more technical information please visit Aeroquipperformance.com For more information on these and other AQP Performance Products see the catalog Aeroquip Performance Products by Eaton A-SPPE-CC001-E Visit www.improvedracing.com for additional support 9 Warranty For warranty information, please visit www.eaton.com/hydraulics/warranty. ed www.eaton.com INSTALL THE BRACKETS 1. Use a 7 mm tool to remove the air dam from the core support bar. 2. Trim the air dam on both sides where shown in Figure 8. Figure 8 - Air Dam Trim Areas (Orange), Both Sides 3. Reinstall the air dam onto the core support. 4. Apply Loctite 243 onto three M6 studs, then reinstall the studs into the air dam holes. 5. Use an E5 tool to torque the studs to 50 lb-in (5.5 N-m). 6. Remove the factory clip nuts, where shown in Figure 9. Figure 9 - Factory Clip Nut Locations 7. Reinstall the new clip nuts included with the hardware kit in their place. 10 Visit www.improvedracing.com for additional support 8. Apply Loctite 243 onto the remaining M6 studs included with the hardware kit. 9. Thread the studs into the barrel nuts. 10. Hand tighten the studs for now. 11. Fasten the brackets to the oil cooler using all four M8 screws included with the hardware kit. 12. Use a 5 mm tool to torque all four screws to 15 lb-ft (20 N-m). 13. Install the oil cooler and mounting brackets onto the car as shown in Figure 10. Figure 10 - Oil Cooler and Mounting Brackets Installed on Car 14. Use a 10 mm tool and the included fender nuts to temporarily install the bracket and oil cooler onto the vehicle. Visit www.improvedracing.com for additional support 11 15. Use a paint pen or permanent marker to trace the top of each bracket onto the plastic shroud as shown in Figure 11 and Figure 12. Figure 11 - Passenger Side Traced Shroud Figure 12 - Driver Side Traced Shroud 12 Visit www.improvedracing.com for additional support 16. Remove the bracket and cooler assembly. 17. Use the paper hole templates to center point punch the rest of the holes as shown in Figure 13. 18. Using a large stepper drill bit or hole saw, create holes according to the instructions on the template. Figure 13 - Passenger and Driver Side Traced Shroud Holes 19. Remove any plastic shavings and debris. Visit www.improvedracing.com for additional support 13 er torque. INSTALL THE COOLER Alternate Tightening Method One 1. Install the long fittings onto the cooler. Flats Method 2. Use a 1 inch tool to torque each fitting according Number of to the steps below: Size Hex Flats Rotations Herea. are the Hand steps tighten thefor an fittings. -04 1 1⁄2 to 1 3⁄4 excellent b. Markmethod ofshown in Figure 14.-06 the flats as 1 to 1 1⁄2 tightening. Anyone can tell -08 c. Tighten 1.25 to 1.75 hex flat rotations. 1 1⁄4 to 1 3⁄4 if the joint was tightened -10 onto 1 1⁄4 3. Reinstall the cooler with brackets and fittings thetoM61 3⁄4 studs. and how much. -12 1 to 1 1⁄2 4. Use a 10 mm tool and the included fender nuts to temporarily install 1. Tighten theagain. the assembly nut by hand -16 3⁄4 to 1 5. until it the Connect bottoms the line EC6-690-51 seats. -20 cooler1⁄2fitting, to the forward to 3⁄4then connect the EC6-690-50 line to the rearward cooler -24 fitting. 1⁄2 to 3⁄4 2. Using a marker, draw a 6. Torque the fittings according to the steps below: line lengthwise on the a. Hand tighten the fittings. nut and extend it onto the adapter. b. Mark the flats as shown in Figure 14. 3. Using a wrench, rotate the nut to tighten. c. Tighten 1.25 to 1.75 hex flat rotations. Turn the nut the amount shown on the chart. Mark a line on the nut Misalignment of the mark and adapter before torquing. shows the amount which the nut was tightened. Figure 14 - Marking the Fittings for Correct Tightening Alternate Tightening Method Two 7. Secure the oil lines with the included cable ties, replacing any removed Theduring second alternate method of tightening is very installation. simple and easy to remember. Bring the nut to hand tight and then rotate a quarter of a turn. This applies to MODIFY THE BUMPER COVER PARTS all sizes. Mark the fitting as indicated in the flat method This part of to confirm thequarter the installation exercises gradual refinement, wherein a turn. safe cut is made, with final fitment requiring additional trims to perfect fitment for your specific Corvette. 1. Cut the bumper cover using the safe cut lines traced onto the part previously. 14 Visit www.improvedracing.com for additional support 2. Cut the black plastic air guide above the bumper cover using the same cut line, shown in Figure 15. Figure 15 - Air Guide Cut Line Locations 3. Mock install the bumper cover by having a friend help hold it, or by using two fender nuts to hold the bumper cover from falling. 4. Determine if the black plastic air guide interferes with the oil cooler, and trim when necessary. There should be about 1/8 inch (3 mm) gap between the front end tank and the black plastic air guide. 5. Apply the hi-temp silicone seal to the top of the rock guard as shown in Figure 16, to further protect from heat. Figure 16 - Rock Guard with Silicone Seal Visit www.improvedracing.com for additional support 15 6. Test install the rock guard assembly. a. Determine whether the bumper cover needs to be widened to fit the rock guard. b. If necessary, remove the rock guard and trim the bumper cover again. c. Repeat until the fitment between the bumper cover and rock guard is satisfactory. 7. Reinstall the rock guard and mark the mounting holes onto the bumper cover. a. Loosely install the nuts again onto the air dam studs, shown by the green arrows in Figure 17. b. Using a marker, trace through the three upper mounting holes, shown by the orange arrows in Figure 17, onto the bumper cover. Figure 17 - Loose Mount Locations and Hole Marking Points 8. Remove the rock guard and drill the holes with a stepper bit. 9. Test fit the clip nuts to determine if the bumper cover requires addi- tional cutting to fit the clip nuts, then install the remaining three clip nuts as shown in Figure 18 on the next page. 16 Visit www.improvedracing.com for additional support Figure 18 - Bumper Cover Clip Nuts Installed PREPARE FOR STARTING 1. Fill a new oil filter with oil and install the oil filter onto the oil pan. Lubricate the oil filter seal with engine oil prior to installation to prevent damage and to ensure a reliable seal. WARNING: DO NOT overtighten the oil filter. 2. Verify all hydraulic connections are coupled and properly torqued. 3. Check the engine oil level and add oil if necessary. 4. Prime the system to fill the engine, lines and heat exchanger with fluid before starting: a. Remove the fuel injector fuses. Consult the vehicle’s factory service manual for the fuse locations. b. Crank the engine over for five seconds to build oil pressure: Repeat three to five times, allowing the starter to rest for a minute. c. Replace the fuel injector fuses removed previously. Fluid prelubers, such as one made by Melling or Motive, are the preferred method for engine oil priming. 5. Start the vehicle and inspect for leaks. Confirm oil pressure is stable and reading the correct value. Visit www.improvedracing.com for additional support 17 6. Turn off the vehicle. 7. Inspect the engine oil level. Add oil when necessary. REINSTALL THE BUMPER COVER & ROCK GUARD 1. Follow the steps from Remove the Bumper Cover section in reverse to reinstall the bumper cover onto the vehicle. 2. Install the rock guard once the bumper cover has been reinstalled onto the vehicle: a. Use a 4 mm hex tool to hand tighten the screws in the clip nuts. b. Use a 10 mm tool to tighten the nuts on the air dam studs to 50 lb-in (5.5 N-m). 3. Close the hood and lower the v

Instruction manuals and test data from Improved Racing, shown as Improved Racing publishes them.

More in Oil Cooler Kits