ATI · Part # 705035

ATI 700R4 4L60E 4L65E - Servo KIT - 4TH Gear - 700

$80.98

Fits: See ATI's description and chart listing for the applications ATI lists; email us your vehicle, engine and transmission to confirm fitment before ordering.

Delivered-price quote. We confirm ATI Performance Products's current dealer price and freight for this part and email you a delivered price before you pay.

No email app? Write to rrmotorservices@gmail.com

Email a question about this partor write to rrmotorservices@gmail.com

Ships from ATI Performance Products in Gwynn Oak, Maryland. We order it from ATI when you place your order and email you the tracking when it ships. Your card is only charged after the supplier confirms the part. We confirm stock and lead time with ATI before charging your card.

Description

ATI Transmission Servo Covers

On ATI's chart for this part:

  • SERVO PISTON FOR - 700R4 & 4L60E/4L65E - 4TH GEAR

Product description from ATI Performance Products.

Product descriptions, charts, photos and installation instructions from ATI Performance Products (atiracing.com) and ATI's price list. Sold by RR Motor Services LLC, an ATI dealer.

Installation instructions

ATI instructions: TV Cable Corrector Kit - Edelbrock/Carter Carb

ATI's instructions (1 page), shown as published by ATI; the original pages with every picture are below.

Installation Instructions

www.atiracing.com

TV CABLE CORRECTOR KIT EDELBROCK/CARTER CARBURETOR Part #702030

1. Disconnect the TV cable and throttle cable from the carburetor’s linkage plate.

2. Align the two holes of the TV corrector plate with the two holes on the carburetor’s linkage plate. Make sure the TV stud on the plate faces away from the carburetor, toward the bottom.

3. Place the flat washer included in the kit between the carburetor’s linkage plate and the corrector plate. This will act as a shim for the new throttle cable stud.

4. Install the throttle cable stud included in the kit. Do not tighten the nut yet!

FOR CARBURETORS WITH A CLIP-ON 5. Install and tighten the supplied bolt and nut THROTTLE CABLE END through both plates as shown. Tighten the throttle cable stud from step 4.

6. Attach both the TV cable and throttle cable. SHIM Adjust as needed.

Note! This kit is designed for carburetors that use a clip- on throttle cable end. If your carburetor uses a ball-type throttle cable stud, you will have to get a ball-type stud with longer threads. You can find these at most performance shops. The TV cable stud provided in the kit is for 6 mm TV cable clips. If your TV cable uses a 5/16” clip, you will need to enlarge the clip to fit the TV cable stud.

THROTTLE CABLE STUD

BOLT AND NUT TV STUD INST. #702030-I 4/2009

ATI instructions: TV Cable Corrector Kit - Edelbrock/Carter Carb: original pages with pictures (1)
ATI instructions: TV Cable Corrector Kit - Edelbrock/Carter Carb, page 1 of 1
ATI instructions: TV Cable Corrector Kit - Edelbrock/Carter Carb, page 1 of 1

ATI instructions: TV Cable Corrector Kit - Holley Carb

ATI's instructions (1 page), shown as published by ATI; the original pages with every picture are below.

Installation Instructions

www.atiracing.com

TV CABLE CORRECTOR KIT HOLLEY CARBURETOR Part #702040

LINKAGE PLATE TV CORRECTOR PLATE THROTTLE STUD HOLES

TV STUD HOLES

NEW TV STUD BOLT

WASHER NUT

1. Disconnect the TV cable and throttle cable from the carburetor.

2. Remove the TV stud and throttle stud from the linkage plate. Save the throttle stud: you will reuse it in step #4.

3. Align the TV and throttle stud holes of the TV corrector plate with the TV and throttle holes on the carburetor’s linkage plate. Make sure the new TV stud faces away from the carburetor.

4. Reinstall the throttle stud. Do not tighten this stud yet!

5. Install the bolt, washer and nut supplied through the TV stud holes of both plates and tighten. Tighten the old throttle stud (from step 4).

6. Attach both the TV cable and throttle cable. Adjust as needed and use the OE TV geometry as a reference when modifying the TV cable bracket location.

INST. #702040-I 4/2009

ATI instructions: TV Cable Corrector Kit - Holley Carb: original pages with pictures (1)
ATI instructions: TV Cable Corrector Kit - Holley Carb, page 1 of 1
ATI instructions: TV Cable Corrector Kit - Holley Carb, page 1 of 1

ATI instructions: 4th Gear Servo Piston

ATI's instructions (1 page), shown as published by ATI; the original pages with every picture are below.

Installation Instructions • www.atiracing.com

4TH GEAR SERVO PISTON PART # 705035

Case Section Packing List Dual Piston Assembly Steel Washer

Packed by: __________________________

Note: This servo affects 4th gear only. It can be used with OEM, Corvette or performance 2nd gear servo assemblies. Steel Washer

Dual Piston Assembly offers 40% more holding power due to greater apply area

Installation 1. Remove the servo cover ring, servo cover and the 4th gear piston that fits inside the servo cover. Discard the servo cover and 4th gear piston. 2. Place the steel washer from the kit onto the servo apply pin.

NOTE: The servo is compatible with all original equipment 2nd gear piston assemblies. If any other type of 2nd apply piston is used, clearance for the outer diameter steel washer over the full travel of the apply pin, MUST BE VERIFIED (see figure 1)

3. With outer o-ring removed, install servo assembly, and retaining ring. 4. Lightly tap on cover to help seat servo cover against retaining ring. 5. Check servo pin travel by measuring the distance that the servo cover moves when the servo cover is pushed into the case. 6. Change servo pins, or grind the tip of the servo pin to achieve desired pin travel (typically .125"). Verify clearance here 7. Once desired servo pin travel has been verified, install Figure 1. Aftermarket 2nd gear piston assembly outer o-ring onto servo cover, and reinstall servo assembly.

INST. #705035 8/2022

ATI instructions: 4th Gear Servo Piston: original pages with pictures (1)
ATI instructions: 4th Gear Servo Piston, page 1 of 1
ATI instructions: 4th Gear Servo Piston, page 1 of 1

ATI instructions: Servo Installation

ATI's instructions (2 pages), shown as published by ATI; the original pages with every picture are below.

Installation Instructions

www.atiperformanceproducts.com

SERVO AND ELECTRONIC HOOK-UP FOR OVERDRIVE UNITS Part #919064 Subject: Proper installation of the throttle valve cable on Factory and after-market carburetors or fuel injections.

NOTE: This cable is MANDATORY to be hooked up unlike with a T-350.

The internal transmission pressure relies heavily on the TV cable for proper rise during acceleration. Failure to hook-up the throttle cable in this way will burn up the three-four-clutch pack and void your warranty. Improper adjustment will also cause abrupt and hard downshifts. Adjusting this cable is the most important step when installing a 700R4, 4L60 or 200-4R transmissions

Make sure you have the correct TV Cable Corrector Kit which is supplied with your new ATI Street Rod Package. Follow all instructions supplied with the kit and then refer back to this page for proper adjustment.

Looking at the throttle shaft lever from the left side in the idle position, approximately 30% of the total throttle lever travel must be to the rear of the throttle shaft centerline and, at wide-open throttle, approximately 70% to the front of the throttle shaft centerline. This will be about 1⁄2 inch to the rear and 1 inch to the front of the throttle shaft centerline. The final step is to adjust the throttle valve cable. The cable must be adjusted so it is pulled fully out at wide-open throttle. To make sure, disconnect the cable, hold the throttle wide open with your left hand, pull the cable fully out with your right hand and see if the cable end lines up with the button on the throttle lever. The cable should also be pulled out 3/8” to 1/2” at idle.

NOTE: Too much preload will cause hard downshift when stopping.

The only thing that changes the shift speed or RPM is the Governor. Spring and weight kits are available if the desired shift timing is not met. The TV Cable will not help or hurt this timing.

Once the TV cable is adjusted the approximate shift points should be 15 to 18, 25 to 30 and 40 to 50 MPH at very light throttle depending on tire size and axle ratio. The full throttle 1-2 shift will usually be at a higher RPM than the 2-3 shifts.

Sometimes on a newly rebuilt 700R4 or 200-4R transmission, it may not make the 3-4 shifts when first installed. A stuck valve or some particles in the fluid, or even an air pocket, can cause this. Raise the rear wheels off the ground, chock the front tires being very careful when doing this. First try putting the car in reverse and revving the engine. This turns the governor in the opposite direction. See if you now have Overdrive. If not, place the transmission in the Overdrive position. Run the speedometer as high as 100 miles per hour, pop the throttle on and off and see if you can force a 3-4 shift. Once it makes the first 3-4 shifts, work the shift lever back and forth between drive and overdrive until the 3-4 shift works properly. 12 Volt Switched Power Supply for Converter Lock Up

The lock-up function on a 700R4 requires 12 volts to be supplied to the single black wire that is sticking out of the plug on your new transmission. This wire needs to be a hooked to a switched 12-volt source. This wire is marked with a positive label.

The lock-up function is only to be used on the highway when cruising in 4th gear. If you fail to turn it off when stopping, you will prematurely fail the lock-up function of the torque converter and deposit a lot of friction material into the transmission oil. This failure will void your warranty. You can install a light in line with the switch as a reminder.

The lock-up function supplies 30 PSI of oil through the input shaft of the transmission into the back of the converter. This pressure pushes the clutch pack away from the internals of the converter and locks up all the internals with the friction side against the backside of the converter. When locked up, your car is being moved by a 1” wide by 10” diameter piece of material. So use it wisely on the highway.

ATI doesn’t recommend or condone the use of a 4th gear pressure switch setup. The problem here is that anytime the car is in 4th gear you will have the transmission locked up. That means even cruising the strip you will be lugging your car’s weight with the small friction area, plus you are not gaining any advantage.

Keep in mind the gear ratio of a 700R4 if you have never had one. A T-350 transmission has a 2.52, then 1.52, and then 1:1. So your largest gear split is only 1.00. Now a 700R4 has a 3.08 first gear, then 1.65, then 1:1 then .69. You have a very large gear split from 1st to 2nd therefore that is hard on the transmission, so proper use and care is a must.

INST. #919064-I 5/2007

ATI instructions: Servo Installation: original pages with pictures (2)
ATI instructions: Servo Installation, page 1 of 2
ATI instructions: Servo Installation, page 1 of 2
ATI instructions: Servo Installation, page 2 of 2
ATI instructions: Servo Installation, page 2 of 2

Installation instructions and pictures from ATI Performance Products (atiracing.com), shown as ATI publishes them.

More in Servo Covers